MOU (FRP)
MOU
Memorandum of Understanding
Final Report On The Project
FRP
Final Report On The Project
Date Of FRP
*
required
MR/MISS As the first party
S/D of
By religion
Resident of
Date of Birth
*
required
Whereas the First party is Handed over the Project of
Where the second party will conduct a project for the first party located
Allotment amount for the construction (as per ESTIMATE))
Work description AND COST AGAINST PER UNIT (as per ESTIMATE)
Agreement for RCC, CIVIL, FINISHING, Interior and Exterior
*
Required
RCC (The calculation of the square feet will be count by the area of total RCC area)
CIVIL ( The calculation of the square feet will be count by the area of multiple surfaces of structure and civil works. We will calculate the multiple surfaces of foundations, Footings, plinth beam, column, primary beam, secondary beam, slab, plinth area Wall, stair, stair cabin, Water tank, Septic tank and other dimensions. )
Interior
Exterior
Renovation
Furniture
In case of CIVIL works Calculation of the sqft
*
Slab area
Surfaces
Not any Civil works available in this agreement
Construction Details/-----------------Structure rate: As per estimate/ Civil rate: As per estimate /Finishing rate: As per estimate/ Interior rate: As per estimate and Foundation Type:
*
Open
PILE
Mate
Mate Pile
Spread footing
Not applicable for the foundation type
Foundation of:
Total no of slab:
Sqft of a single slab:
Sqft of other RCC works ( Wall, Column):
Sqft of the Stair cabin and water tank slab:
Total sqft of slab area:
AMC Availability Foundation and structure up to 10 years
*
Applicable for this agreement
Not Applicable for this agreement
Payment Details/---------- Accounts Holder Name- ---- Address- ---- PIN---- AC/ NO----- IFSC----- BRANCH------
Allotment amount from the client for the construction: (in figure )
Payment and Instalment details, Any Amount paid by the first party will not be refundable in any conditions. ( The Login and consultancy amount) These amount are not included in the estimate
That the work which the 2nd party has taken shall be completed within a period of
In few conditions, until we get any refered project from your side we won't be able to finish the proposed construction in a concerning amount. ( Valid only for Specific clients) Valid for the client or not: …………………………………
Email
Code
Phone
Aadhra/ Vhoter/ DL
Upload File
Upload supported file (Max 15MB)
Cancel Cheque
Upload File
Upload supported file (Max 15MB)
Pan Card
Upload File
Upload supported file (Max 15MB)
T MAPE Signature of the client
Upload File
Upload supported file (Max 15MB)
Passport Size Photo
Upload File
Upload supported file (Max 15MB)
SIGNATURE
SIGNATURE
Upload supported file (Max 15MB)
INTERIOR RATE AND WORK DESCRIPTION
EXTERIOR RATE AND WORK DESCRIPTION
I agree to the terms & conditions..
View terms of use
START DATE OF EVENT is not the date of agreement
*
required
PROBABLE STARTING DATE OF CONSTRUCTION
*
required
END
ARN NO
Professional Fees for Consultancy, DRAWING, ESTIMATE SURVEY WITH GST
ESTIMATE
Upload File
Upload supported file (Max 15MB)
DRAWING
Upload File
Upload supported file (Max 15MB)
DESIGN
Upload File
Upload supported file (Max 15MB)
PAYMENT BREAKDOWN
Upload File
Upload supported file (Max 15MB)
“The portion of the funds to be utilized for construction work in this project is outlined below as a percentage of the first instalment. The remaining amount shall be retained and utilized as an investment until the completion of the project.”
Submit
Thanks for submitting!
bottom of page